An ERP implementation plan is a structured roadmap that defines how an organization will select, configure, deploy, and adopt Enterprise Resource Planning software. A well-prepared plan connects business objectives with software requirements, project responsibilities, data preparation, testing, employee training, and the final go-live process.

ERP software can help organizations connect departments such as finance, sales, purchasing, inventory, manufacturing, and human resources through shared business information. However, purchasing software alone does not guarantee improved efficiency. Businesses must also review their existing workflows, prepare accurate data, involve employees, and establish a realistic project schedule.

This guide explains how to develop an ERP implementation project plan, which activities to include, how to manage risks, and what organizations should consider before launching an ERP system.

Key takeaway: A successful ERP project starts with clear business objectives and realistic requirements. It progresses through planning, configuration, data migration, integration, testing, training, go-live, and continuous improvement.

What Is an ERP Implementation Plan?

An ERP implementation plan documents the activities, resources, responsibilities, timelines, and decisions required to introduce an ERP system into a business. It provides a common reference for management, project managers, department heads, implementation consultants, technical teams, and end users.

The plan should explain what the organization wants to achieve, which business processes the system will support, which features are required, and how the project team will measure progress. It should also establish how changes to the original scope will be evaluated and approved.

Depending on the complexity of the organization, an ERP project plan may cover:

  • Business objectives and measurable project outcomes.
  • Current process analysis and future workflow requirements.
  • ERP software selection and vendor responsibilities.
  • Project scope, budget, milestones, and resource allocation.
  • System configuration, customisation, and integrations.
  • Data cleansing, migration, and validation.
  • Testing, employee training, and change management.
  • Go-live readiness, support arrangements, and performance reviews.

The level of detail should reflect the project. A smaller organization with straightforward processes may need a relatively simple plan, while a manufacturer or multi-location business may require more detailed coordination across departments, sites, systems, and suppliers.

Why Is ERP Implementation Planning Important?

ERP software often affects how employees record transactions, manage inventory, approve purchases, process customer orders, and report business performance. Changes to one workflow can affect other departments, making coordination essential.

Clear business direction

Defined objectives help teams prioritize the features and workflows that matter most instead of configuring the system without a clear purpose.

Better project control

Milestones, responsibilities, and approval processes make it easier to identify delays and resolve decisions before they affect the wider project.

Reduced operational disruption

Testing, training, data validation, and cutover planning help prepare the business to transition from existing processes to the new system.

Stronger user adoption

Employee involvement and role-specific training help users understand the new workflows and the reasons behind process changes.

Planning cannot eliminate every risk. It creates a framework for identifying uncertainties, assigning ownership, making informed decisions, and responding when requirements or timelines change.

How to Develop an ERP Implementation Plan: Step-by-Step Guide

The following steps provide a practical framework for planning an ERP project. Some activities can run in parallel, while others depend on earlier decisions or completed deliverables.

1

Define Why Your Company Needs ERP Software

The first step is to identify the business problems the organization wants to solve. ERP should not be introduced simply because the company is growing or because another business uses a particular platform. The project should address specific operational needs.

Common reasons for considering ERP software include disconnected systems, duplicate data entry, limited inventory visibility, slow financial reporting, inconsistent approval processes, and difficulty coordinating departments.

Document the current challenges and describe the desired future state. For example, a business may want to improve purchase-order visibility, reduce manual reconciliation, standardize sales order processing, or provide management with more consistent operational reports.

Where possible, establish measurable indicators such as order-processing time, inventory accuracy, reporting turnaround, invoice-processing time, or the number of manual steps in a workflow. Record the baseline before the project begins so that results can be evaluated after launch.

Deliverable: A business case that explains the objectives, expected benefits, major constraints, and criteria for evaluating project success.

2

Conduct a Detailed Business Requirements Analysis

Requirements analysis establishes what the ERP system must support. This involves reviewing existing processes, speaking with department representatives, identifying business rules, and documenting gaps between current operations and the desired future workflows.

Include both internal users and relevant external stakeholders, such as suppliers, customers, logistics partners, or other parties whose processes connect with the organization.

Review requirements across relevant departments:

  • Finance and accounting: General ledger, accounts payable, accounts receivable, tax configuration, budgeting, and financial reporting.
  • Sales and customer management: Quotations, customer records, sales orders, pricing, invoicing, and order status.
  • Purchasing: Supplier records, purchase requests, approvals, purchase orders, and incoming deliveries.
  • Inventory and warehousing: Stock locations, receipts, transfers, reservations, replenishment, and stock counts.
  • Manufacturing: Bills of materials, work orders, routing, material requirements, production scheduling, and quality checks where required.
  • Human resources: Employee records, leave processes, attendance, payroll requirements, and access permissions where applicable.

Separate essential requirements from optional improvements. This distinction helps prevent the project scope from expanding without adequate consideration of cost, time, testing, and maintenance.

Deliverable: A documented requirements list, process maps, prioritized requirements, and a record of unresolved questions.

3

Evaluate ERP Software and Select the Right Vendor

ERP selection should be based on business requirements rather than software popularity alone. A solution that works well for one organization may not be suitable for another with different production methods, reporting needs, integrations, or compliance obligations.

Prepare an evaluation framework that compares shortlisted solutions against the requirements identified during analysis. Assess both functional capabilities and the practical effort required to deploy and maintain the system.

  • Required business modules and workflow coverage.
  • Configuration flexibility and the need for custom development.
  • Integration capabilities with existing systems.
  • Reporting, dashboards, and data-export options.
  • User experience, access controls, and security features.
  • Hosting, performance, backup, and recovery arrangements.
  • Licensing, implementation services, training, and support costs.
  • Vendor expertise, references, documentation, and support availability.

Request demonstrations based on realistic business scenarios rather than generic presentations. Ask the vendor to show how the system would handle the organization's actual processes, including exceptions and approval requirements.

Estimate the total cost of ownership rather than considering software licensing alone. Configuration, migration, integrations, customisation, training, ongoing support, and future upgrades may all contribute to the overall investment.

Deliverable: A documented software evaluation, selected solution, agreed scope, and an understanding of vendor and customer responsibilities.

4

Establish Project Governance and Assign Responsibilities

ERP projects involve decisions that cross departmental boundaries. A governance structure clarifies who makes those decisions, who approves changes, and who is accountable for delivering each activity.

Assign a project sponsor who can support business priorities and resolve escalated issues. Appoint a project manager to coordinate schedules, risks, meetings, deliverables, and communication between the organization and its ERP partner.

Department representatives should validate requirements and workflows for their respective areas. Technical team members may manage integrations, access controls, infrastructure, and data migration, while implementation consultants guide configuration and functional setup.

Establish regular project reviews and a documented process for handling decisions, issues, risks, and scope changes. Significant changes should be assessed for their impact on budget, deadlines, resources, testing, and business operations before approval.

Deliverable: A project governance structure, responsibility matrix, meeting schedule, escalation path, and decision-making process.

5

Prepare a Realistic ERP Project Timeline and Budget

Develop the project schedule using the scope, business complexity, available resources, integration requirements, data condition, and level of customisation. Avoid setting a go-live date before understanding the work needed to reach operational readiness.

Break the project into manageable phases and assign owners, dependencies, expected outputs, review points, and approval criteria to each phase.

A planning schedule may include the following activities:

Project phase Typical activities Expected output
Discovery and planning Objectives, scope, team, risks, and requirements Approved project plan
Design and configuration Workflows, settings, roles, and system setup Configured ERP environment
Development and integration Approved extensions, interfaces, and connected systems Integrated solution ready for validation
Data migration Data cleansing, mapping, import, and reconciliation Validated business data
Testing and training Process testing, issue resolution, and user preparation Test evidence and trained users
Go-live and stabilization Cutover, monitoring, support, and issue resolution Operational ERP system

Not every phase must be completed entirely before the next begins. Some activities can overlap when dependencies, resources, and risks are managed appropriately.

The budget should account for internal employee time as well as external services. Include a reasonable contingency for identified risks and establish how additional work will be approved.

Deliverable: An agreed project schedule, milestone plan, budget, resource plan, and process for managing changes.

6

Review and Improve Existing Business Processes

ERP planning provides an opportunity to examine whether existing processes are efficient, consistent, and suitable for the future business. Transferring every existing workaround into a new system can increase complexity and create unnecessary maintenance requirements.

Map the current process, identify bottlenecks, and design the intended future workflow. Determine which practices should be retained, which should be standardized, and which require revision.

Where possible, use standard ERP capabilities for common business activities. Customisation should be considered when a genuine business requirement cannot be addressed appropriately through standard configuration or an available supported extension.

Document approval rules, exceptions, responsibilities, and reporting needs before configuring the system. Department heads and process owners should review the proposed workflows to ensure that they are practical.

Deliverable: Approved future-state process maps and documented business rules.

7

Plan Data Cleansing and Migration Carefully

Data migration is one of the most important technical and business activities in an ERP project. The new system may depend on information from spreadsheets, legacy applications, accounting software, warehouse tools, or other databases.

Moving poor-quality data into a new system can carry existing problems into the new environment. Incomplete customer records, duplicate suppliers, inconsistent product codes, inaccurate stock quantities, and outdated price lists may affect transactions and reporting after launch.

A structured migration process should include:

  • Identify the data sources and the business owner for each dataset.
  • Determine which records must be migrated and which can be archived.
  • Remove duplicates and correct incomplete or inconsistent information.
  • Map legacy fields to the corresponding ERP fields.
  • Validate units of measure, product identifiers, account codes, and reference data.
  • Run trial migrations in a test environment before the final transfer.
  • Reconcile record counts, balances, stock quantities, and critical business totals.
  • Obtain sign-off from the relevant business owners.

Agree on how opening balances, open purchase orders, open sales orders, inventory, customer records, supplier records, and historical information will be handled. The required datasets depend on the organization's processes and reporting obligations.

Deliverable: An approved migration plan, validated datasets, reconciliation evidence, and a documented final migration procedure.

8

Manage Customisation and System Integrations

ERP software may need to exchange information with e-commerce platforms, payment services, warehouse applications, shipping systems, customer relationship management tools, reporting platforms, or other business applications.

Before building integrations, identify which systems are involved, what information must be exchanged, which system is the source of truth, how frequently updates should occur, and what should happen when a transfer fails.

For each integration, document the data fields, authentication method, error handling, monitoring requirements, and responsibility for ongoing support. Consider how duplicate transactions, delayed responses, and temporary service interruptions will be handled.

Customisation also requires careful control. Additional fields, reports, workflows, and code may help address specific needs, but they can increase testing effort, upgrade complexity, and long-term maintenance.

Record the business justification for each major customisation. Test the change with the affected workflows and consider the consequences for future upgrades before approving it.

Deliverable: An approved integration design, controlled customisation list, and documented test requirements.

9

Configure the ERP System and Validate Business Workflows

Configuration translates approved requirements into system settings. Depending on the selected ERP platform, this may include company information, currencies, tax rules, warehouses, product categories, user roles, approval routes, accounting settings, and manufacturing parameters.

Configure the system in a controlled environment and maintain records of important decisions. Use realistic business examples to confirm that the setup supports the intended process from beginning to end.

For example, a sales process might begin with a quotation, continue through sales order confirmation and stock availability checks, and finish with delivery and invoicing. Testing the entire workflow can reveal dependencies that may not be obvious when individual screens are reviewed separately.

Assign business owners to validate their respective workflows. Unresolved requirements or configuration decisions should be recorded and assessed rather than silently postponed until the launch date.

Deliverable: A configured system with reviewed settings, approved workflows, and a record of outstanding items.

10

Conduct Thorough ERP Testing Before Go-Live

Testing checks whether the ERP system works as intended and whether business users can complete their day-to-day activities. Testing should begin before the final launch and continue as configuration, migration, and integrations evolve.

Plan testing around real business scenarios rather than limiting validation to individual features.

  • Functional testing: Confirm that individual features and configurations behave as expected.
  • End-to-end testing: Validate complete processes that cross departments or modules.
  • Integration testing: Confirm that connected systems exchange the correct information.
  • Data validation: Check migrated records, balances, quantities, and reference data.
  • Access testing: Confirm that users have appropriate permissions for their roles.
  • Performance testing: Evaluate system responsiveness under relevant workloads where required.
  • User acceptance testing: Ask business users to verify that the system supports approved requirements.

Maintain a record of test scenarios, expected results, actual results, defects, severity, responsible owners, and retest outcomes. Critical issues should be resolved and retested before the system is approved for launch.

Business representatives should formally review whether the system is ready for the processes they own. A test completion percentage alone is not enough if critical business workflows remain unreliable.

Deliverable: Test records, resolved critical defects, business acceptance, and documented launch-readiness decisions.

11

Provide Employee Training and Manage Organizational Change

ERP software changes how employees access information and perform tasks. Without suitable preparation, users may continue using old spreadsheets, create workarounds, enter incorrect information, or avoid the new workflows.

Training should be role-specific. Finance employees may need guidance on accounting entries and reconciliations, warehouse teams may require instruction on receipts and transfers, and sales staff may need to learn quotations, orders, and customer records.

Useful training activities include:

  • Role-based training sessions using realistic examples.
  • Step-by-step process documentation and quick reference guides.
  • Practice exercises in a training or test environment.
  • Training for supervisors and designated internal support users.
  • A method for collecting questions and reporting issues.
  • Refresher sessions when workflows change or new features are introduced.

Explain why the organization is changing its processes, what users should expect, and where they can get help. Department representatives can support communication by gathering feedback and identifying areas where additional guidance is needed.

Allow enough time for users to practise essential tasks before the system goes live. Attendance at training should not be treated as proof that every employee is ready; users should also demonstrate that they can complete their key responsibilities.

Deliverable: A training plan, user documentation, attendance records where appropriate, and evidence of readiness for key roles.

12

Involve Top Management and Business Process Owners

Management involvement is important because ERP projects can require decisions about budgets, operational priorities, staffing, process standardization, and acceptable levels of risk.

Senior leaders should communicate the business objectives, support the project team, and help resolve issues that cannot be settled at the working level. They should also ensure that department heads allocate sufficient time for requirements reviews, testing, training, and approvals.

Business process owners should be accountable for validating the workflows used by their departments. The project manager coordinates activities, but business leaders remain responsible for confirming that the new processes are suitable for the organization.

Establish regular progress reviews that focus on decisions, risks, milestone status, unresolved issues, budget changes, and readiness for upcoming phases. Clear escalation procedures help prevent important decisions from remaining unresolved for too long.

Deliverable: Active executive sponsorship, engaged process owners, timely decisions, and clear accountability.

13

Prepare a Detailed ERP Go-Live and Cutover Plan

Go-live is the transition from the previous operating arrangements to the new ERP system. This stage requires coordination between business teams, technical staff, management, and the implementation partner.

The cutover plan should specify the sequence of activities, responsible individuals, completion criteria, communication arrangements, and contingency actions. It should be rehearsed when possible, particularly when the transition involves complex data migration or multiple connected systems.

Key activities may include:

  • Confirm final business acceptance and launch approval.
  • Complete final data checks and scheduled migration activities.
  • Define when transactions in legacy systems will stop or become restricted.
  • Confirm user accounts, access permissions, and support contacts.
  • Validate critical integrations, reports, balances, and business transactions.
  • Communicate the transition schedule and any temporary operating restrictions.
  • Confirm backup, recovery, and contingency arrangements appropriate to the system.
  • Assign decision-makers who can address unexpected issues during the transition.

A rollback or recovery approach should be considered where technically and operationally feasible. The project team must understand the consequences of reversing a transition after new transactions have already been recorded.

Do not treat the planned date as the only measure of success. If critical data, security, operational, or business acceptance conditions are not met, management should assess the risks before authorizing launch.

Deliverable: An approved cutover checklist, communication plan, support arrangements, and go-live decision.

14

Provide Post-Go-Live Support and Continuous Improvement

ERP work continues after launch. Employees may need help with unfamiliar workflows, data issues may become visible during live operations, and some processes may require adjustment based on real usage.

Plan a stabilization period with clearly assigned support responsibilities. Define how users report issues, how incidents are prioritized, who approves configuration changes, and how urgent business problems are escalated.

Monitor performance indicators related to the original business objectives. These might include transaction-processing time, inventory accuracy, order completion, reporting turnaround, user adoption, or the volume of unresolved support requests.

Review feedback from users and process owners, separate defects from enhancement requests, and prioritize improvements according to business impact. Changes should follow suitable testing and approval procedures so that improvements do not introduce avoidable operational risks.

Deliverable: A support process, issue log, performance review, and prioritized post-launch improvement plan.

ERP Implementation Checklist Before Starting the Project

Use this checklist to review whether the organization has addressed the main planning requirements before moving into major configuration and deployment activities.

  • Business objectives and success measures are documented.
  • Project scope and exclusions are clearly defined.
  • Department requirements and future workflows are reviewed.
  • ERP software and vendor responsibilities are agreed.
  • Project sponsor, manager, process owners, and technical contacts are assigned.
  • Timeline, milestones, budget, and resources are approved.
  • Data sources, ownership, cleansing, and migration requirements are documented.
  • Integrations and customisation requirements are assessed.
  • Testing, user acceptance, and defect management procedures are planned.
  • Employee training and change communication are scheduled.
  • Go-live criteria, cutover responsibilities, and support arrangements are defined.
  • Risks, escalation routes, and contingency plans are documented.

Common ERP Implementation Planning Mistakes to Avoid

Many project difficulties can be traced to gaps in preparation, unclear ownership, or decisions made without considering their effect on the wider organization. The following mistakes deserve particular attention.

Unclear project objectives

Without defined outcomes, teams may prioritize features that do not address the most important business problems.

Uncontrolled scope changes

Adding requirements without evaluating cost, dependencies, and testing can disrupt the approved project schedule.

Insufficient data preparation

Moving duplicate, incomplete, or inaccurate records into the new system can undermine transactions and reporting.

Limited employee involvement

Leaving users out of requirements reviews and testing can result in workflows that do not reflect real operational needs.

Too little testing time

Launching before critical defects are resolved increases the risk of operational disruption and unreliable results.

Unrealistic launch commitments

Choosing a fixed date without evaluating readiness can encourage teams to overlook important validation activities.

How Long Does an ERP Implementation Take?

There is no universal ERP implementation timeline. The duration depends on the organization's size, number of locations, process complexity, data quality, integrations, customisation, availability of internal staff, and the implementation approach.

A project involving a limited set of standard workflows may require less work than a multi-site deployment with complex manufacturing, extensive legacy data, and multiple third-party integrations. The project team should estimate duration after reviewing the requirements and dependencies rather than relying on a generic timeframe.

To build a realistic schedule, identify the work required for each phase, estimate resource availability, record dependencies, and include time for testing, issue resolution, training, and launch preparation. Review the schedule regularly as the team learns more about the project.

How to Measure the Success of an ERP Implementation

ERP success should be assessed against the business objectives established at the beginning of the project. Completing configuration and launching the software are important milestones, but they do not by themselves demonstrate that the organization has achieved the expected benefits.

Depending on the original objectives, useful measures may include:

  • Process efficiency: Changes in the time needed to complete important business workflows.
  • Inventory accuracy: Agreement between recorded inventory and verified physical stock.
  • Reporting quality: Timeliness, consistency, and usefulness of management reports.
  • Data quality: Completeness and accuracy of important customer, supplier, product, and financial records.
  • User adoption: Whether employees are using the intended ERP processes and completing their responsibilities correctly.
  • Operational stability: The number, severity, and resolution time of issues affecting critical activities.
  • Business outcomes: Progress against the financial or operational goals documented in the original business case.

Record baseline measurements before launch and review them at suitable intervals after deployment. Some benefits may take time to become visible, especially when they depend on changes in employee behaviour, process consistency, or management decision-making.

Conclusion: Build a Strong Foundation for ERP Implementation

A structured ERP implementation plan helps organizations turn software requirements into a coordinated business transformation project. Defining objectives, analyzing processes, selecting suitable software, assigning responsibilities, and preparing a realistic schedule establishes the foundation for the work ahead.

Data migration, configuration, integrations, testing, and employee training require careful coordination because each can affect the reliability of the final system. Go-live preparation and post-launch support are equally important for maintaining business continuity and helping employees adopt the new workflows.

Organizations should treat ERP implementation as a business-led project supported by technology, not simply as a software installation. With clear ownership, disciplined planning, regular communication, and measurable success criteria, businesses can make more informed decisions throughout the project lifecycle.

Looking for ERP Planning and Odoo Services?

Globalteckz provides services related to Odoo ERP, including project planning, configuration, implementation, training, and support. The appropriate approach depends on your business processes, functional requirements, integrations, and operational goals.

Discuss your requirements with the Globalteckz team to explore an ERP approach aligned with your organization's needs.

Email: sales@globalteckz.com

What is an ERP implementation plan? +

An ERP implementation plan is a structured roadmap that defines how an organization will plan, configure, test, deploy and adopt an ERP system. It generally covers business requirements, project responsibilities, timelines, training, testing, data migration, risk management and post-implementation support.

Why is ERP implementation planning important? +

ERP implementation planning helps an organization understand its business requirements, prepare employees and stakeholders, define project responsibilities and establish a clear implementation approach. Proper planning can also help identify potential challenges before the system goes live.

What are the main steps in an ERP implementation plan? +

A typical ERP implementation plan may include defining business objectives, analyzing requirements, selecting and configuring the ERP system, preparing data, testing workflows, training users, planning deployment and providing ongoing support.

Who should be involved in ERP implementation planning? +

ERP implementation planning should involve key stakeholders from different areas of the organization. This can include top management, department heads, employees, actual system users, project managers and ERP implementation specialists.

How do you identify ERP requirements before implementation? +

ERP requirements can be identified by reviewing existing business processes, workflows, departmental requirements, reporting needs and operational challenges. Involving employees and stakeholders during requirements analysis helps document how the organization currently operates and what it expects from the new ERP system.

How long does an ERP implementation take? +

ERP implementation timelines vary depending on factors such as the size of the organization, number of departments, business requirements, system configuration, data migration, integrations, customization and user training. A detailed project plan should establish realistic timelines for each stage of the implementation.

Why is employee training important during ERP implementation? +

Employee training helps users understand the new system, their workflows and the processes they need to follow. Sufficient training can support user adoption and reduce confusion when the ERP system is introduced into daily business operations.

What role does top management play in ERP implementation? +

Top management can provide direction, approve key project decisions and help align the ERP implementation with organizational objectives. Their involvement also helps ensure that different departments remain aligned during the implementation process.

What happens if an ERP implementation is not properly planned? +

Poor planning can result in unclear requirements, unrealistic timelines, insufficient training, inadequate testing and difficulties during deployment. A structured implementation plan helps the organization identify these areas and prepare for them before the system goes live.

Can an ERP implementation plan be changed during the project? +

Yes. An ERP implementation plan may need to be refined as requirements, workflows, testing results or business priorities become clearer. However, changes should be documented and evaluated so that their impact on project scope, resources and timelines can be understood.

Before we go into ERP implementation – Planning of ERP implementation is very important part. Enterprise Resource planning software is considered as one of the most important tool for small to mid sized businesses to plan every department in an optimized way. To reap the benefits of ERP software it requires proper implementation approach including the involvement of employees, stakeholders and the actual users.  ERP implementation plan sometimes also needed refining of your current business processes and organisational procedures to meet the demand and this can be only achieved when you have a proper ERP implementation plan.

Read our Article – How Consultants help successful ERP implementation

How to develop ERP implementation plan

Most of the ERP Expert feels that Problems don’t arise within the software that has been offered based on industries, but through the way companies plan the software development including the methodology. To make sure you have a proper ERP implementation project plan which will tends to success you need to follow the best practices.

The basic is why your company needs ERP software?

This is the upmost basic question that arises to clarify the purpose of ERP software in your organization. It also helps to lay a foundation to understand the requirements in different departments, defining the purpose of an ERP system and so on . . .

Read our Article – How to select Best ERP Software for your business

Requirements Scrutinizing

Every organization that tends to implement an ERP solution always focuses on the internal resource during requirements analysis which is incorrect. You also need to consider the external business process and stake holders as an example. To check the capabilities of ERP software you can run a complex business process which will help you to understand the timelines for ERP development. For Business requirement Analysis you can take help of ERP experts who helps you to bring all your workflows and requirements on paper that further helps you to enhance and optimize the ERP implementation process.

Plan Little early

There are many case studies available over the internet on the stretching of ERP implementation timelines which tends to failures. There may be several issues but the most important one is poor planning and late planning. Poor planning where you don’t provide enough time for understanding the key performances, vendor capabilities, feedbacks, test analysis, risk management and so on and late planning refers to not giving enough time and starting the project in hurry. We have seen companies taking 1 year time to decide on ERP selection without doing proper homework.

Read our Article – Why Web based ERP software is preferred mostly

Keep good time for training

Once you implement ERP software another critical task is to train the user about how the system works many companies don’t invest much in training where the user get de-motivated as they don’t know how to use the system properly. Further lack of training also creates failures as the ERP implemented successfully is not much used by the user. The training person should be completely understandable on each and every functional areas of the business including the ERP software.

Involve Top management

ERP implementation is not successful until top management involved during analysis and implementation. As top level management provides valuable inputs to make sure the system is implemented with powerful processes.

Implementing an ERP system is totally based on the functionalities you are looking out but making it successful implementation is based on the project plan you create with every step which we have discussed in this blog post.

At Globalteckz

We at Globalteckz offers you with one of the leading open source erp software named as Odoo – We are official odoo partners and have successfully completed more than 50+ projects across the globe. We offer end to end services including ERP project planning, implementation strategy, training and support.

For more information you can email us on sales@globalteckz.com

Read more Articles from Globalteckz :

Leave Comment